· Exterior

Hot Tub, Step 4 – Electrical

The old hot tub’s circuit was a half-assed mess of shared power and rotted wiring, so the new tub gets a proper 220V circuit in a fresh trench.

· Exterior

Next Project: Hot tub, Step 1

The 35-year-old hot tub that came with the house turned green, and the plastic was disintegrating, so it’s time to find a new one.

· Exterior

So many wood chips

Spreading the giant piles of wood chips around the property, a few cubic feet at a time. Who needs a gym?

· Exterior

Will it rot?

A varmint-proof composter and a Bear Cat chipper, so we don’t end up with a trash heap of our own.

· Exterior

Another pool post

Another pool post: the pump controller was installed improperly, so it’s rewired and replaced, and the persistent leak is sealed.

· Exterior

Stega cleans up

I clear out the pile of branches and logs the previous owners left to rot in the north pasture.

· Exterior

Trees: Before and After

Before and after: the giant gum tree, the fig and the walnut outside my office get some serious pruning.

· Exterior

The Trash Heap

Tree Techs By the Bay clears the previous owners’ giant trash heap by the barn, leaving us a lifetime supply of wood chips and a mystery farm relic.

· Exterior

A muddy start…

The grinders arrive to tackle the trash heap, and promptly get stuck in thick, heavy mud.

· Exterior

Debris Removal Week

Debris removal week: filling a dumpster with some of the decades of junk the previous owners left behind.

· Exterior

The end of the little stable

Agent Smith and his dad take down the derelict little stable on the south side, all the way to the quasi-foundation in one day.

· Exterior

Dog House Down

The structurally unsound old dog shelter comes down, a great opportunity to put Dino, the new tractor, to work.