At the End of the Driveway, Part 2: Gate Cams
Power, a camera pole, a Ubiquiti link and some PoE cameras finally put eyes on the gate–no cloud required. And the case of the moving rock.
Power, a camera pole, a Ubiquiti link and some PoE cameras finally put eyes on the gate–no cloud required. And the case of the moving rock.
The wind kept tipping our trash bins (and the neighbors’) over the curb at the end of our quarter-mile driveway, so Rafa and his brothers built a trash bar out of old fence posts. Not one tipped bin since.
An epic street sign from a friend, and updated address signs at the end of our driveway.
Why we abhor We Love Paving: they skipped part of the driveway and all of the easement and courtyard.
A mystery plaque from one of the driveway lights, plus plans for new glass in the smaller lights.
Agent Smith builds a sifter to sort the asphalt spoils from the old driveway.
The driveway, courtyard and easement are finally paved.
Without water and with a dirt driveway: replacing the main water line to the house.
After the wall, the driveway was trashed, so we started repaving it, and hit a water line that wasn’t buried deep enough.
A driveway repaving project becomes a replace-the-main-water-line project, and I’m on day two without water.
Our neighbors’ horses escaped onto our property, and the rider who came to fetch them left a present on our driveway.
My first night at Purgatory, after hauling a truckload of boxes down in Barbie, ahead of the well tank replacement.
New videos of the main gate, the old barn and the horrid dog kennel, plus a week of rain and delays. I have a pry bar, and I know how to use it.
Pictures of the cracked, crumbly driveway before it gets repaired and resealed.
Meeting the Wall Guy, plumbers who rescheduled 15 minutes before the appointment and a well tank replacement that will need a crane.
