Interior Walls: Prep Work
Prepping the boys’ space for paint: pulling up the chewed vinyl and patching four jacks’ worth of holes.
Prepping the boys’ space for paint: pulling up the chewed vinyl and patching four jacks’ worth of holes.
The Doc’s old rodeo ring cut left us our own little pit, which has been useful for disposing of concrete.
The driveway, courtyard and easement are finally paved.
Living with two feathered dinosaurs means stuff like this happens…regularly.
Without water and with a dirt driveway: replacing the main water line to the house.
After the wall, the driveway was trashed, so we started repaving it, and hit a water line that wasn’t buried deep enough.
Last chance to enter our first contest and win a Purgatory cap or tote bag.
The Wall Saga, addendum: Giggles the skid steer and a few last details. The end of the Great Wall of Purgatory.
The Wall Saga: the finishing touches go on, just in time for the winter rains.
The Wall Saga: the blocks go in, one by one, while I’m stuck in bed with a cold.
A neighbor’s dodgy animal pens are spilling onto our property, and getting anyone to deal with it is a saga.
Two years in, the original project list updated, plus everything else we’ve done.
The Wall Saga: unloading 96 concrete blocks, eight truckloads’ worth.
Not enough entries, so the contest prize goes up to a Purgatory cap or tote bag, and the deadline is extended.
The Wall Saga: why getting our addresses fixed in Apple and Google Maps mattered so much for the big trucks.
