· Projects

In the Trench, Part 2

In the trench, part 2: Able replaces the line from the wellhead to the tank and buries new conduit.

· Update

Long Lines

Tracing and staking the power line and water main on the hillside, mostly for our own records.

· Exterior

Gate Power (again)

A fallen tree, a bird’s nest in the breaker panel and new wiring finally get reliable power to the front gate.

· Interior

Fire in the hole

The old brass floor boxes in the great room, and why water and electricity don’t mix.