Matchy-Matchy and Some Tape and Some Labels
Matching lights outside the bedroom and kitchen, and taped and labeled switches in the studio.
Matching lights outside the bedroom and kitchen, and taped and labeled switches in the studio.
In the trench, part 2: Able replaces the line from the wellhead to the tank and buries new conduit.
Proper power at the main gate, and lights on the condor and Agatha at night.
Making the great room great: deleting the sconces and adding simple circular lights.
Tracing and staking the power line and water main on the hillside, mostly for our own records.
Switches in my office for the courtyard lights, a big quality-of-life improvement.
Battery backup: the power wall displaced the hose reel post, so Agent Smith built a better one.
Battery backup: the Tesla Powerwall install, and an early lesson about running on battery.
Battery backup: why we chose a power wall over a big diesel generator.
The boys eat things they shouldn’t: shoes, a hammer and a power cord.
Agent Smith replaces the dying amplifier in the M Coupe, and no more static.
A fallen tree, a bird’s nest in the breaker panel and new wiring finally get reliable power to the front gate.
Finding the brass floor box covers we needed on eBay, for a fraction of the price.
The replacement water heater literally melted its wiring, so it’s replaced again, properly this time.
The old brass floor boxes in the great room, and why water and electricity don’t mix.
The rotting utility closet door outside gets replaced with one that’s actually meant for outdoors.
A tree fell on a power line on our property, PG&E’s tech took the low road, and the line turned out to be connected to nothing.
A very corroded pool light bulb, because the previous owner wouldn’t spend a few extra dollars on a new housing seal.
Voltz Electric upgrades our 175-amp service to 200 amps and replaces the fifty-year-old panel.
