The Wall Saga: Footer In Place
The Wall Saga: the footer is in, and the concrete cures.
The Wall Saga: an annotated video of the epic concrete pumping.
The Wall Saga: pumping day, with four trucks of concrete to fill the forms.
To celebrate finishing the pool resurfacing, our first-ever contest: guess how much water it took to fill the pool.
The Wall Saga: building the forms for the footer, while block deliveries trickle in.
The Wall Saga: 6’x6’x2′ blocks from Granite Rock, 18-wheelers on our inclines and a contractor whose project management was lacking.
The Wall Saga: four excavators, telehandlers and the first block deliveries.
The Wall Saga: trench warfare against the pocket gophers, plus a walk through the great trench.
The Wall Saga: trimming, ramping and cutting into the hillside, and an engineering firm that falls behind.
Free rocks from NextDoor and a pile of asphalt spoils. Who needs a gym?
Mail thieves made it up the hill, so we and our neighbors now have FortKnox mailboxes.