· Projects

New Doors Acquired

Since buying this place, one of the tiny, yet annoying, issues was the large gap between the front doors. The gap was unsightly, but more…

· Interior

One More Studio Innovation

When we lived in SF, we had two couches in the living room. Agent Smith purchased them for his first place in SF before we…

· Interior

Wine Room Redo

Carrying on from the last post, the studio building also has a wee wine room. When we first viewed the property, there wasn’t much wine…

· Interior

The Studio Building Today

Back in 1999 the previous owners built the studio building. As documented in past posts, it’s just a weird building. Comprising three actual rooms and…

· Every Day Things

Divesting

While we have purchased many things since buying this crazy place, we’ve also managed to get rid of a lot of things left here by…

· Every Day Things

Arcadia

A somewhat odd fact about the living space at Purgatory is that we have many exterior doors for both the house and studio buildings. The…

· Interior

Last Studio Details: Blinds and Curtains

Continuing on from the last two posts–as part of the studio renovation, we ordered remote-control motorized blinds via Blinds.com and matching drapes. Installing the blinds…

· Interior

Studio Painting

Before lights and rugs and blinds were installed in the studio building, we had our regular painter come and give the space some love. I…

· Interior

Sealing and Lighting the Studio

The long, drawn-out saga of the studio building has taken longer to write about than the actual work took to complete! Past posts detailed the…

· Projects

Upstairs in the Studio

Returning to the Studio renovation saga–things limped along for quite a while last winter, but once the windows were in place we were able to…

· Projects

Studio Window and Door Kvetching

Who actually needs four separate doors into a building that is basically just two rooms? Well, apparently the POs did. Between building the studio in 1999…

· Projects

Studio With New Flooring

Once the prep work was complete, it was time to put in some tile–lots and lots of tile. Once the tiles were in place, the…

· Projects

Studio Flooring Prep

Once everything was out of the studio and the materials for the new floors arrived, it was time to get to work. 1. First the…

· Projects

Studio Prep

We wrote a while back about a flood in the studio building, and this past summer we started work not only repairing the damage, but…

· Interior

The size of things

I managed to contract some sort of plague last week and spent much time in bed with a fever and congestion. While AS and his…