Skip to content
  • Menu Item
  • Menu Item
  • Menu Item
  • Menu Item
  • Menu Item
Purgatory Auto Works and Dinosaur Farm

Purgatory Auto Works and Dinosaur Farm

Where we do stuff

  • About
    • The Cast
    • The Contractor List
    • Weather
    • Stay
    • Privacy Policy
  • Aerial
    • Original Aerial Photos
    • December 2017
    • November 2016
    • May 2018
    • April 2019 Aerial Photos
  • Other Media
    • Vista
      • 2025 Time Lapse
      • 2024 Timelapses
      • 2023 Timelapse
      • 2022 Timelapses
      • 2021 Timelapses
      • Past Videos
    • Stega on Instagram
    • The Boys on Instagram
    • Building Race Cars
    • The Race Team
  • North Garden Stream
  • Toggle search form
Tiled Studio

Studio With New Flooring

Posted on November 24, 2017July 1, 2025 By stega

Once the prep work was complete, it was time to put in some tile–lots and lots of tile.


Once the tiles were in place, the grout went in.


And then it was time for the loft area. Even the crazy closet-within-a-closet had laminate flooring installed within it.

Once the flooring was done, it was time to sort out the windows and doors.

Projects Tags:Studio

Post navigation

Previous Post: Studio Flooring Prep
Next Post: Another Appliance Story
  • The Bus Made the News Vehicles
  • A/C condenser units sloppily installed
    Getting Off the Diesel, Part 1 Interior
  • Fortnight lily
    Flowers at Purgatory Every Day Things
  • Frank the Sharpie dulled
    Birds and Windows Crafts
  • New Trees, and then New, New Trees Update
  • Wireless-izing the furnace
    The Bowels of Purgatory, Part 3: Thermostat Enlightenment Interior
  • Rainbow over Purgatory
    The Tale of the Driveway Repaving, Part 2 of 3 Exterior
  • Trees: Before and After Exterior

Archives

Timelapse Video

Aerial Animal Art Auction Birds Courtyard Crafts Driveway Electrical Exterior Fence Flooring Foyer Furnace Furniture Garage Great Room Kitchen Lights Machinery Neighbors Nest Box North Garden North Hallway North Office Painting Panorama Pit Plants Plumbing Pool Race Car Road Shed Stables Stega Studio Stuff Trash Travel Tree Vehicles View Wall Well

On This Day

  • Split-level concrete poured
    Shed Pad Time
    2022
  • Sand between the toes
    Vacation Part 2
    2020

See all...

Stega's Other Sites
networkgirl-icon
Stega All Around the World
diving-icon
The Diving Stega
voice-icon
The Talking Stega
flying-icon
The Flying Stega
stega-icon
Outside My Window

sdat-icon
All Content Copyright: Stega Doggie and Tree LLC

Copyright © 2025 Stega Doggie and Tree LLC