Purgatory

Studio with new flooring

Once the prep work was complete, it was time to put in some tile. Lots and lots of tile.


Once the tiles were in place the grout went in.


 

And then it was time for the loft area.

Even the crazy closet in a closet was had laminate flooring installed within it.

Once the flooring was done it was time to sort out the windows and doors….

SaveSave

0 0 vote
Article Rating
Subscribe
Notify of
0 Comments
Inline Feedbacks
View all comments
Wordpress Social Share Plugin powered by Ultimatelysocial
0
Would love your thoughts, please comment.x
()
x