Dog House Down
The structurally unsound old dog shelter comes down, a great opportunity to put Dino, the new tractor, to work.
The structurally unsound old dog shelter comes down, a great opportunity to put Dino, the new tractor, to work.
A new water softener replaces the ancient Kinetico, with a small flood along the way, and we coin a new phrase for the previous owners’ half-assed fixes.
Able finishes the septic job, a county inspector checks things over and the hole gets filled.
End of day one: the new septic tank is in place, and we can flush the toilets.
The septic hole is now much, much bigger, and the house is vibrating.
Septic day! The failed tank, never pumped in over ten years, finally gets pumped out and demolished.
Before and after shots of the great room and entry roofs. All the tar and paper were patches.
Voltz Electric upgrades our 175-amp service to 200 amps and replaces the fifty-year-old panel.
Bringing the original teak parquet floors back to life myself instead of having them professionally cleaned and polished.
Replacing the filthy carpets in two rooms with bamboo flooring, starting with an unhelpful flooring store and ending at Lumber Liquidators.
The new flat roofs go on, and the great room reveals dry rot so extensive the wood was still wet in July. All repaired, and still under budget.
Epic fail: the contractor flipped their crane truck while trying to move the old well tank. Fortunately nobody was hurt.
My first night at Purgatory, after hauling a truckload of boxes down in Barbie, ahead of the well tank replacement.
The view from the well, 200 feet above the house, why a rusting 10,000-gallon metal well tank is a problem and the Whale’s broken camshaft at LeMons.
We have a wall problem: the old railroad-tie retaining wall is failing, and on the south side the deck and pool edging are heading down the hill.
Pictures of the cracked, crumbly driveway before it gets repaired and resealed.
Less than two weeks in: we have network connectivity, a plumbing quote for the drains and freshly cleaned carpets, with mixed results.
Exploring the new house: a first dip in the pool, three contractors who didn’t show and a pile of garbage the previous owners left at the end of the driveway.
The starter list of projects for the new house, from roofs, the well tank and septic to fences, a 300-foot retaining wall and the pool cover. And this is just the starter edition.
