Things are not done yet though. The outbound end isn’t connected to the leach fields and the inlet isn’t fully connected, but we can take a shower/flush the toilets/do dishes now.
Tomorrow the guys from Able will be back to finish the job. For now though, I have a backhoe parked 20 feet from my desk.
Here are more pics: most were taken through my office windows. Also there are a couple of vids of them moving the tank in place up on the Photo Stream.
11-14-17 Edit: The video is now on YouTube and linked to at the end of this post.