Before the teak that runs through most of the house could be refinished, a lot–and I mean a lot–of repairs had to be made. There were, in total, five old furnace register holes, three monument electrical outlets (meaning they were in the floor/ground), and sections that were damaged by water long before we bought the place.
One of the very few good things the previous owners left us was a box of parquet teak pieces that, according to the newsprint I found in the box, were purchased in the mid-90s. The unfinished pieces match the existing floor pattern. Now that we had the boards to match the flooring in the blue room and north office, it was just a matter of scheduling. Since Agent Smith’s dad was due to visit late that summer, it wasn’t until mid-October that this project got underway.
Scott Leslie, owner of Leslie Hardwood Flooring, did all the repair work himself. He’s a total floor geek–I love contractors who love what they do!
The two areas of most concern were where serious water damage had occurred. This meant quite a mess would be made before things looked remotely good again. The area by the west-facing sliding glass doors of the great room had seen some serious issues in the past, and it took Scott half a day to expose all the damage, deal with it and prep for new teak to be added. Complicating things was a hole from an old furnace register in this area. There was so much damage that he had to repair and/or replace the floor boards underneath.
Immediately to the left of this was a second furnace register hole that needed filling and a monument outlet. Just to the right of the water-damaged area was another monument outlet. (We had decommissioned the electrical service to all of these in 2015 when we had the main electrical panel replaced.)
Then there was the junction of the foyer and great room. At some point, there was a persistent water issue that funneled water down from the roof. We encountered this issue early on, and since learned to keep a calendar reminder going to make us check the drain of said roof so it doesn’t happen again. While we rebuilt the inside of the coat closet early on, we knew that section of the floor was going to need some extensive repairs.
Because the damage was so extensive (and so much more than a one-time leak), some serious excavation of the damaged area was needed. Scott ended up removing the entire section from the corner pillar of the foyer/coat closet to the opposite wall, as all the underlying wood/floorboards had extensive damage, and put in a new underlay board. Once it and the sealant he put in cured, he got to work laying in new parquet, but because of the settling of the house over the last fifty years on top of the damage, it wasn’t going to be a “perfect” fit.
He ended up altering the parquet pattern ever so subtly to address the issues. As you can see below, he used some of the long pieces to create a long line, then shaved a bit off the smaller squares to fit in the spaces.
There were a few other holes left from the old furnace registers, but these were fairly easy to address.