Skip to content
  • Menu Item
  • Menu Item
  • Menu Item
  • Menu Item
  • Menu Item
Purgatory Auto Works and Dinosaur Farm

Purgatory Auto Works and Dinosaur Farm

Where we do stuff

  • About
    • The Cast
    • The Contractor List
    • Weather
    • Stay
    • Privacy Policy
  • Aerial
    • Original Aerial Photos
    • December 2017
    • November 2016
    • May 2018
    • April 2019 Aerial Photos
  • Other Media
    • Vista
      • 2025 Time Lapse
      • 2024 Timelapses
      • 2023 Timelapse
      • 2022 Timelapses
      • 2021 Timelapses
      • Past Videos
    • Stega on Instagram
    • The Boys on Instagram
    • Building Race Cars
    • The Race Team
  • North Garden Stream
  • Toggle search form
Ready for spelunking

Finishing Pool Touches

Posted on July 19, 2017May 29, 2025 By stega

Because of delays we had to wait a day for water trucks to fill the pool. We decided at the start of the project to not fill from our well, but instead pay to have water brought to us and pumped into the empty pool. Of course it rained the day between finishing and filling, so we had a wee bit of a head start.

Based on the dimensions of the pool and basic math, we thought the pool held about 44,000 gallons of water. This was the estimate we gave to Bay Area Water Trucks, and since one of their trucks holds 4000 gallons of water, we expected it would take 11 loads to fill the pool. So when a truck arrived promptly on Thursday, May 25, the driver was ready for a full day of shuttling water up the hill. It turns out just one driver was needed for the whole fill-up, as after each load he’d head back down to a city hydrant, hook up his meter and fill up, then drive back to Purgatory and unload. Thankfully he didn’t need a long hose run since access to the pool is just a short walk off the main courtyard.

The driver was very experienced at filling pools and he taped an old pillowcase to the end of hose after suspending it with rope. This made sure even at the lowest pump setting the water wouldn’t damage the new finish. The first load was the slowest part of the filling process, as he didn’t want to really open things up until most of the deep end of the pool was covered by water and the hose was floating freely.

A few truckloads into the process, we realized that the pool holds significantly less water than basic math had led us to believe. Instead of 44,000 gallons, in the end we needed just 35,000 gallons of water. Still a lot of water and still a very big pool, but almost 1/4 less than we anticipated and we got it filled with just 9 loads of water–coming up fully loaded was not an issue as these sort of trucks are what help fight fires in the mountains.


We then had to turn on the pump to start circulating and getting chlorine in the water. Our regular pool people were booked up, so we learned how to do it ourselves, including servicing some of the equipment and learning how to start the chemicalization. After we got things circulating, a technician from Pool Covers Inc came out and reinstalled the cover rails and sorted out the rest of the cover apparatus. We didn’t remove the cover from the channel during the resurfacing like we did during the balcony tile replacement last year, but left the cover rolled up in its channel. A few days after the cover was back on, a crew from Sea Bright Solar came out to check the solar panels they had installed almost two years earlier and make sure everything was good to fire up. And fire up we did–a heat wave meant the pool went from 72 degrees to over 90 in just a couple of days. We backed off the solar and the pool is now at a lovely 84-86 degrees.

And just like that, we were done, and not since the septic tank project nearly two years ago has a major project gone so smoothly. The choice to go with Adams paid off and we’re happy that the project is done, within budget with just a few unavoidable delays, and best of all, the pool looks awesome. Sure, there were a few hiccups–finding out the main drain never worked properly since it had been blocked up by the POs before we bought the place, and a small disaster in the studio building again caused by the stupidity of the POs (an issue tangential to the resurfacing project and which will be covered in a post or two once the “solution” is completed).

We came across two little pencil sketches the tile crew had done on the coping to explain to one another how the * across the bottom should go. Since these will fade away soon, I made sure to get pics of them.


And finally, here’s a vid of opening/closing the pool with some stroke action in between:

The Pool in all its new glory
Projects Tags:Pool

Post navigation

Previous Post: Pool Revamp: New Finish
Next Post: Getting Things Done
  • Mardi Gras!
    Even More Auction Finds Interior
  • Garage from cherrypicker
    Garage Lighting Projects
  • Panorama September 2017
    New Panoramas Exterior
  • Panorama April 2020
    Sunday Panorama Panorama
  • Water, Water Everywhere, Part 3: And Some to Drink Interior
  • More Storm Damage Update
  • Panorama of Ollerton Colliery
    Travel Panorama Panorama
  • Today’s Log Every Day Things

Archives

Timelapse Video

Aerial Animal Art Auction Birds Courtyard Crafts Driveway Electrical Exterior Fence Flooring Foyer Furnace Furniture Garage Great Room Kitchen Lights Machinery Neighbors Nest Box North Garden North Hallway North Office Painting Panorama Pit Plants Plumbing Pool Race Car Road Shed Stables Stega Studio Stuff Trash Travel Tree Vehicles View Wall Well

On This Day

  • Above-the-fogline panorama June 2023
    Sunday Panorama
    2023
  • Stega(TM)-Brand Whiteboard Diving Map
    Stega’s Aborted Vacation
    2021

See all...

Stega's Other Sites
networkgirl-icon
Stega All Around the World
diving-icon
The Diving Stega
voice-icon
The Talking Stega
flying-icon
The Flying Stega
stega-icon
Outside My Window

sdat-icon
All Content Copyright: Stega Doggie and Tree LLC

Copyright © 2025 Stega Doggie and Tree LLC