Skip to content
  • Menu Item
  • Menu Item
  • Menu Item
  • Menu Item
  • Menu Item
Purgatory Auto Works and Dinosaur Farm

Purgatory Auto Works and Dinosaur Farm

Where we do stuff

  • About
    • The Cast
    • The Contractor List
    • Weather
    • Stay
    • Privacy Policy
  • Aerial
    • Original Aerial Photos
    • December 2017
    • November 2016
    • May 2018
    • April 2019 Aerial Photos
  • Other Media
    • Vista
      • 2025 Time Lapse
      • 2024 Timelapses
      • 2023 Timelapse
      • 2022 Timelapses
      • 2021 Timelapses
      • Past Videos
    • Stega on Instagram
    • The Boys on Instagram
    • Building Race Cars
    • The Race Team
  • North Garden Stream
  • Toggle search form
Fill 'er up!

Pool Revamp: New Finish

Posted on July 17, 2017May 29, 2025 By stega

Once all the holes were sealed and the plumbing sorted, we had to wait to finish the resurfacing project, as the company that manufactures the coping we had ordered was behind schedule. The wait wasn’t terribly long, and another crew from Adams arrived to do the work the second week of May. Their arrival was a bit delayed, as the pickup truck was fully loaded with coping, tiles, mortar mix, rebar and tools. Said truck was also a front-wheel drive automatic and was so heavy that the crew couldn’t get it up the last hill to our driveway. They ended up putting the truck in reverse and backing up hill. Yet another crazy story about living halfway up a mountain.

Here are pics of the coping and water line tile install, which took several days.


In addition to the NPT waterline tile which matches the balcony tile we had done last year, the crew also did three lines across the pool floor. I normally swim laps between the southwest and northeast corners, and since moving in I’d been dropping a weighted rope line into the pool each time I wanted to work out. The new tiles not only look awesome but mean far less effort is now involved when swimming laps.


After the tile and coping were in place they had to cure, and then a crew of just one person came out to apply the mastic between the concrete patio and the coping.


The following week, the surface crew arrived and laid down the new finish in a shockingly short amount of time. The guy who did the last bit of the finish was tossed down balls of the mixture, which he then smoothed into place. Once he was done, he slipped off his gunite spike shoes and walked up the tile line and out of the pool.

Then all that was left to do was fill it up.

Update Tags:Pool

Post navigation

Previous Post: Cooked Water Heater
Next Post: Finishing Pool Touches
  • Catbox
    Purgatory Feral Kitten Update Every Day Things
  • Laying replacement parquet over repaired floor
    Teaky Teak Interior
  • New front doors
    New Doors Acquired Projects
  • Sunday Panorama Panorama
  • Panorama of smoke-filled skies August 2018
    Fires to the North, Fires to the South Every Day Things
  • Sunday Panorama Panorama
  • No more upside-down insulation
    Insulating Ourselves Projects
  • The temporary tank and old tank
    Well that didn’t go very well… Exterior

Archives

Timelapse Video

Aerial Animal Art Auction Birds Courtyard Crafts Driveway Electrical Exterior Fence Flooring Foyer Furnace Furniture Garage Great Room Kitchen Lights Machinery Neighbors Nest Box North Garden North Hallway North Office Painting Panorama Pit Plants Plumbing Pool Race Car Road Shed Stables Stega Studio Stuff Trash Travel Tree Vehicles View Wall Well

On This Day

  • Above-the-fogline panorama June 2023
    Sunday Panorama
    2023
  • Stega(TM)-Brand Whiteboard Diving Map
    Stega’s Aborted Vacation
    2021

See all...

Stega's Other Sites
networkgirl-icon
Stega All Around the World
diving-icon
The Diving Stega
voice-icon
The Talking Stega
flying-icon
The Flying Stega
stega-icon
Outside My Window

sdat-icon
All Content Copyright: Stega Doggie and Tree LLC

Copyright © 2025 Stega Doggie and Tree LLC