Skip to content
  • Menu Item
  • Menu Item
  • Menu Item
  • Menu Item
  • Menu Item
Purgatory Auto Works and Dinosaur Farm

Purgatory Auto Works and Dinosaur Farm

Where we do stuff

  • About
    • The Cast
    • The Contractor List
    • Weather
    • Stay
    • Privacy Policy
  • Aerial
    • Original Aerial Photos
    • December 2017
    • November 2016
    • May 2018
    • April 2019 Aerial Photos
  • Other Media
    • Vista
      • 2025 Time Lapse
      • 2024 Timelapses
      • 2023 Timelapse
      • 2022 Timelapses
      • 2021 Timelapses
      • Past Videos
    • Stega on Instagram
    • The Boys on Instagram
    • Building Race Cars
    • The Race Team
  • North Garden Stream
  • Toggle search form
Panorama of driveway repaving day 1

Paving Snags

Posted on January 27, 2017March 20, 2025 By stega

It’s been a busy week at Purgatory, as a driveway repaving project has also become a let’s-replace-the-main-water-line-to-the-house project. This is currently day 2 without water, but thankfully I have bottled water to drink and a 44,000 gallon pool from which to draw for doing things like dishes or washing debris off the floor beneath the bird cages. Thankfully I also will be up north this weekend where I will have access to a shower (although one of our nearest neighbors graciously let me use their shower two days ago). Anyway, here are some images of the initial damage and what we uncovered:

1. First the broken metal pipe. It was just a few inches beneath the soil at this point…

2. …and it was located right in the middle of the courtyard…

3. …and as it approached the house, it rose up steeply instead of staying at a safer depth…

4. …and of course the pad of the garage was poured over the line.

5. So the solution? Abandon the old line and run a new main line from the junction behind the garage. Here’s a shot of the new trench out to the fire hydrant.

6. Notice that the line stays at a nice deep 18 inches, even as it approaches the house.

7. Panorama of the repaving.

Once the crew finishes, hopefully water service will be restored. They still need to trench alongside the garage to lay the second section of pipe (there will be two pipes in this section, one for the hydrant and one for main house line). Also, there are electrical connections in the ground that we need to keep intact; right now all power to the garage area is of course switched off at the main panel. Many, many things can still go lopsided at this point, so it’s best to just pack my overnight bag and make for that nice hot shower just across the Golden Gate.

Projects Tags:Driveway, Water

Post navigation

Previous Post: Very slow changes in the garage
Next Post: Ketchup cleans up!
  • Panorama August 2022
    Sunday Panorama Panorama
  • Old deck
    Pools, hot tubs, and other watery updates Exterior
  • Kitchen After
    Photo Stream* Highlights Every Day Things
  • More Flooring Tales Interior
  • Ready for spelunking
    Finishing Pool Touches Projects
  • Panorama January 4, 2019
    The Views Up Here, January 4, 2019 Exterior
  • The fog
    A muddy start… Exterior
  • Train station 'do-rag
    On to Paris Travel

Archives

Timelapse Video

Aerial Animal Art Auction Birds Courtyard Crafts Driveway Electrical Exterior Fence Flooring Foyer Furnace Furniture Garage Great Room Kitchen Lights Machinery Neighbors Nest Box North Garden North Hallway North Office Painting Panorama Pit Plants Plumbing Pool Race Car Road Shed Stables Stega Studio Stuff Trash Travel Tree Vehicles View Wall Well

On This Day

  • Above-the-fogline panorama June 2023
    Sunday Panorama
    2023
  • Stega(TM)-Brand Whiteboard Diving Map
    Stega’s Aborted Vacation
    2021

See all...

Stega's Other Sites
networkgirl-icon
Stega All Around the World
diving-icon
The Diving Stega
voice-icon
The Talking Stega
flying-icon
The Flying Stega
stega-icon
Outside My Window

sdat-icon
All Content Copyright: Stega Doggie and Tree LLC

Copyright © 2025 Stega Doggie and Tree LLC