Following on from the previous post, once the demo work was done the crew laid in some drain pipe — while avoiding the existing electrical run out to the courtyard lights and the one over to the studio building. Then it was time to lay the new pavers and get to the plantings.
Laying the pavers required marking things out, putting down base rock, compacting it and then laying the funky putty like cement stuff before finally laying out the pretty pavers.
After a lot of work, it was finally time to plant things and lay in the irrigation. Here are some photos just after all that was done.
And finally, here are some shots taken the day I wrote this post — which was about a month from when it will be posted as I’m lining up a bunch of content to try to stay catchup on all the news while also staying ahead and not having several months go by with nothing going up on this site.